Shutting
20220411_201307.jpg  20220411_195859.jpg 
Reply 1 0
Shutting
so I finished the front hub motor install, I found a way to get a washer on the inside of both of the fork dropouts, installed the heavy duty torque arm supports by tapping the fender support to a 6mm bolt fell much better about the thicker bolt. Adjusted the brake to accommodate for that inside dropout washer. Done........battery box I'm just waiting for my Sheets of ABS plastic to come next week from Amazon to cover the frame I built and cover the controller bolted behind the seat tube.  I connected all the wires to new system and took it for a ride!! Awesome acceleration with hands on both throttles. My first ride impressions were.......Man so happy I took the time to do it right that it was a flawless first ride. Now tank and seat install.....in these pics they are just resting on the frame for pics to get idea what bike will eventually look like. Thanks
Reply 2 0
5S Dude
That is a crazy amount of work you've done Shutting! Love that the tank and seat combo, makes it look like a different bike! Very Cool.
Reply 1 0
Reply